Buyers BP200 Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Pour la voiture Buyers BP200. Buyers BP200 User Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 2
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
Quality since 1946
9049 Tyler Blvd. • Mentor, Ohio 44060
Phone (440) 974-8888 • Fax (440) 974-0165
Toll-Free Fax 800-841-8003 • buyersproducts.com
Installation Instructions
BP200 25-Ton Pintle Hook
WARNING
Maintain adequate vertical (tongue) load to prop-
erly control the trailer (generally 10%) but do not
exceed the above rated capacities.
WARNING
It is the users responsibility to be sure that the pin-
tle hook mounting surface is capable of 6,000 lbs.
vertical load and 50,000 lbs. gross trailer weight.
Towing Applications
Use with trailers and equipment designed for over
the road towing within the stated capacities. Use
only with nonswivel-type drawbar. This pintle
hook is ideal for use in the utility and construction
industries. For off-road applications, reduce the
stated capacities by 25%.
Drawbar Eye Dimensions
2-3/8" to 3" I.D. with 1-1/4" to 1-5/8" diameter section.
Mounting
1. Use a mounting structure of sufficient strength
to support the rated capacity ot the pintle hook in
accordance with S.A.E. J 849B.
2. Use the hole pattern shown on the reverse.
3. Remove the cotter pin, nut, washer, spring and
both flanges.
4. Install flanges using 6-1/2" grade 8 bolts prop-
erly tightened.
5. Install pintle, spring, washer and nut. Tighten
nut to slightly compress spring. Install cotter key
in nut castellation. Spread cotter pin.
Operating Instructions
1. Before operating, check for proper operation,
worn, damaged or missing parts and secure
mounting. Correct flaws before use.
2. Move pintle to correct coupling position as
shown above. (Latch on top)
3. Open latch by removing safety pin and lifting lock.
4. Lower drawbar eye over the horn of the pintle.
WARNING: Do not damage the latch. Be careful
with the drawbar when coupling or uncoupling.
5. Close latch and insert safety pin.
WARNING: Other steps and inspections are
also required. Consult D.O.T. regulations and
American Trucking Association for complete
coupling and uncoupling procedures.
Maintenance
For proper performance, perform the following every
3,000 miles or 3 months, whichever comes first.
1. Clean and inspect for proper operation.
2. Inspect, in particular, the coupling area. Replace
when wear exceeds 1/8" (.125") from the original
surface profile.
3. Inspect for worn, damaged or missing parts.
Replace as required.
4. Regularly lubricate latch and lock pivots with
a light oil lubricant.
5. Check the mounting bolts for proper torque.
Capacity
6,000 lbs. Maximum Vertical Load
50,000 lbs. Maximum Gross Trailer Weight
Vue de la page 0
1 2

Résumé du contenu

Page 1 - Installation Instructions

Quality since 19469049 Tyler Blvd. • Mentor, Ohio 44060Phone (440) 974-8888 • Fax (440) 974-0165Toll-Free Fax 800-841-8003 • buyersproducts.comInstall

Page 2 - Warranty

Quality since 19469049 Tyler Blvd. • Mentor, Ohio 44060Phone (440) 974-8888 • Fax (440) 974-0165Toll-Free Fax 800-841-8003 • buyersproducts.com3002525

Commentaires sur ces manuels

Pas de commentaire